We wrote this guide because it's one of the questions we're asked most often on WhatsApp.
The basic rule
With a new apartment under construction, you're not yet buying an apartment: you're buying a promise, from a company, on a plot of land. So your checks are three — the company, the land and the permit — and all of them can be done before you hand over a single leu.
1. The company that signs
Ask for the full name and tax ID (CUI) of the company that will sign the preliminary contract. Check them in the Trade Register or on the public company-data portals: does it exist, is it active, who runs it. Compare with what the project website says. At Micro City, the company is MICRO CITY S.R.L., tax ID 49857541, and its details are published on the site precisely so they can be checked.
2. The land: the land-book extract
The information extract can be obtained online in a few minutes from the ANCPI portal, using the cadastral number. You look at: who the owner is (it should be the selling company or one from the same group, with a clear explanation), whether there are mortgages or encumbrances, and whether any litigation is noted. A bank mortgage for the construction loan is normal; ask how it's removed at handover.
3. The building permit
Ask for the permit number and check what it authorises: the height regime, the number of apartments, the use. It must match what you're being sold. If the project was modified along the way — which happens often and legally — there must be an amended permit. The plans you receive (the apartment layout) must be the approved ones, not a more generous “presentation” version.
4. The preliminary contract: the clauses that matter
- the handover date and the penalty per day of delay;
- what happens to the deposit if the bank doesn't approve your mortgage;
- the finishing standard, as an annex, not as a promise;
- the area — usable, built, with or without the terrace — and the permitted tolerance;
- the price, with VAT stated explicitly;
- the account you pay into: the selling company's, not an individual's.
5. At handover
The acceptance report on completion of the works, the land registration of the building, the apartment's cadastre, the energy certificate, the building's technical book. Without them you can't draw the final mortgage and you can't sign at the notary. A developer who has done it before knows the order — ask them how it went at their previous building.
Don't forget
All the checks above are free or cost a few lei. A notary or lawyer who reads the preliminary contract before you sign costs little compared with what it protects. And if something doesn't get a clear answer, the unclear answer is usually the answer.

